Biotechnology Temperature Control Modules
The largest skids had to be built in two sections so they could be transported to the customer.
The largest skids had to be built in two sections so they could be transported to the customer.
CSI developed a commercially available alloy that a biotechnology company could economically source for their process piping.
CSI was approached by an engineering firm to provide clean-in-place (CIP) systems for a large greenfield animal health facility.
The customer, a global producer of food and beverage products, contacted CSI to fix their frequent leaking issues with existing fittings.
The customer needed a clean-in-place system for a new bottling line. CSI designed a CIP 2.0 control system to meet the rigorous needs of the brewery.