From concept to commissioning, CSI has you covered

Commissioning ensures your hygienic processing system is ready for safe, efficient operation.

Before a processing facility is turned over to plant personnel for routine operations, the site is systematically programmed, tested, and verified by our experts. Commissioning takes place for new construction and for existing systems when systems are upgraded.

The Importance of Commissioning

The commissioning process includes various activities that result in application-specific benefits and documentation.

This includes tasks that engineers, programmers, and service technicians perform once the installation is finished and until the system is handed over to the customer for operation and maintenance.

Contact Us

Importance of Commissioning
Commissioning - What we do

Our Commissioning Process

Commissioning includes calibrating and testing of monitoring and control systems. Once on site, a CSI commissioning engineer typically spends two days to complete the start-up process.

  1. They perform a walk down of the system to verify the overall installation is complete, including power, steam supply, water supply, air supply, and drain.
  2. An input/output (I/O) check of equipment within the system boundary then verifies the proper operation of instruments, and manually actuating solenoid valves verifies that air lines to valves are connected and operational.
  3. A motor test verifies their proper operation and rotation.
  4. A system start-up then runs through all programs to verify the system operates according to contract requirements.
  5. Training sessions covering system components and overall operation provide buyer personnel with the information they need to maintain safe and efficient operation after commissioning.